5 kW On-Grid Solar System
Bungalow and villa grade system generating around 600 units a month — covers ACs, pumps and EV charging with surplus exported.
5 kW On-Grid Solar System
Bungalow and villa grade system generating around 600 units a month — covers ACs, pumps and EV charging with surplus exported.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
10 × 540 Wp ALMM-listed modules
5 kW string inverter with dual MPPT
Engineered structure for high-wind roof zones
Complete DC/AC protection and earthing
Export metering and net-metering support
Technical specifications
| Modules | 10 × 540 Wp |
|---|---|
| Inverter | 5 kW dual MPPT string inverter |
| Generation | ~600 units per month |
| Roof area | ~50 m² |
| Project timeline | 10–14 days after approval |
| Warranty | 25 years module performance, 5 years inverter, 5 years workmanship |
What the price includes
- Site survey and structural design
- Supply, installation and commissioning
- Subsidy and net-metering assistance
- 5 years O&M
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
5 kW On-Grid Solar System FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 5 kW On-Grid Solar System?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.