1 kW On-Grid Solar System
Ideal for 1 BHK homes consuming 100–130 units a month. Covers lights, fans, TV, router and a small refrigerator.
1 kW On-Grid Solar System
Ideal for 1 BHK homes consuming 100–130 units a month. Covers lights, fans, TV, router and a small refrigerator.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
2 × 540 Wp ALMM-listed mono modules
1 kW string inverter with Wi-Fi monitoring
Elevated galvanised structure
DC and AC protection box with surge arrestor
Earthing pit and lightning arrestor
Subsidy application and net-metering support
Technical specifications
| Modules | 2 × 540 Wp monocrystalline |
|---|---|
| Inverter | 1 kW string inverter, IP65 |
| Structure | Galvanised MS, 3 ft elevation |
| Generation | ~120 units per month |
| Roof area | ~10 m² |
| Warranty | 25 yr module / 5 yr inverter |
| Warranty | 25 years module performance, 5 years inverter, 5 years workmanship |
What the price includes
- Design and engineering
- All material except DISCOM net meter fee
- Installation and commissioning
- PM Surya Ghar application filing
- 5 years O&M support
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
1 kW On-Grid Solar System FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 1 kW On-Grid Solar System?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.