+91 98220 12345 sales@ecoharbor.in Mon – Sat, 9:30 AM – 7:00 PM
MNRE Channel Partner • MSEDCL Empanelled Serving all of Maharashtra

Solar Company in Nagpur — Rooftop Solar & Solar Pumps

Vidarbha’s high summer irradiance makes Nagpur one of the best solar locations in India. We install rooftops, solar pumps and industrial plants across Nagpur, Wardha, Bhandara and Kamptee.

Serving Nagpur since 20179822012348 • local numberPincode 440015
48 hrssite survey in Nagpur
₹78,000max central rooftop subsidy
4.9/5customer rating

High-yield location

Nagpur receives among the highest solar irradiation in Maharashtra, so systems here generate roughly 8–12% more per kW than coastal locations. Our proposals for Vidarbha use location-specific yield figures rather than generic state averages.

Industrial and MSME demand

Butibori, Hingna and MIHAN industries increasingly pair rooftop solar with demand-charge management. We model both energy and demand savings so the plant is optimised for the actual bill, not just monthly consumption.

Solar pumps in Vidarbha

Orange belt growers in Katol and Kalmeshwar use 3–7.5 HP solar pumps for irrigation; we handle borewell surveys, head measurement, plumbing and PM-KUSUM documentation.

Solar services available in Nagpur

✔

Rooftop solar installation with PM Surya Ghar subsidy

✔

Solar water pump installation (PM-KUSUM) and repairs

✔

Commercial and industrial rooftop solar plants

✔

Solar street light supply and installation

✔

Panel cleaning, AMC and performance health checks

✔

Subsidy, net-metering and bank loan documentation support

Our solar services in Nagpur

Areas and talukas we cover around Nagpur

  • Dharampeth
  • Sadar
  • Civil Lines
  • Manish Nagar
  • Wardha Road
  • Kamptee Road
  • Hingna
  • Butibori
  • MIHAN
  • Katol
  • Kalmeshwar
  • Umred
  • Wardha
  • Bhandara

Subsidy status in Nagpur

Residential rooftop systems remain eligible for PM Surya Ghar central subsidy of ₹30,000/kW up to 2 kW and ₹78,000 for 3 kW and above, with additional state benefits where notified. We verify your eligibility before you pay anything.

Check eligibility

Local net-metering support

We submit the online application, follow up at the local MSEDCL/DISCOM office, coordinate the meter installation and commissioning test — so you start exporting power without chasing paperwork.

How it works

Customer reviews from Nagpur & nearby

★★★★★

“Exceptional service from start to finish! The team handled our 3 kW rooftop installation professionally and completed the work ahead of schedule. The subsidy paperwork was filed the same week we signed.”

Ramesh Patil Homeowner • Nashik • Residential rooftop
★★★★★

“EcoHarbor’s engineers explained the shading problem on our terrace that two other vendors ignored. Six months later the generation matches the estimate they gave us almost exactly.”

Anita Deshmukh Homeowner • Ahmednagar • Residential rooftop
★★★★★

“We run a 5 HP solar pump on 6 acres. Diesel cost is zero now and we irrigate whenever we want instead of waiting for the feeder. Installation was clean and the plumbing was included.”

Vijay Kale Farm owner • Parbhani • Solar pump
★★★★★

“Great customer support! Even after installation the team promptly assisted with the net-metering follow-up and answered all my questions about the monitoring app.”

Sunita Gaikwad Homeowner • Pune • Residential rooftop
4 verified reviews • 4.9/5 average rating

Frequently asked questions – Nagpur

How much subsidy do I get on rooftop solar in Maharashtra?
Under PM Surya Ghar: Muft Bijli Yojana, residential consumers get ₹30,000 per kW up to 2 kW and ₹78,000 in total for 3 kW and above. The amount is credited directly to your bank account after installation and net-metering are completed.
How many units does a 3 kW solar system generate per month?
In Maharashtra a well-designed 3 kW rooftop system generates roughly 340–380 units per month across the year, higher in March–April and lower during the monsoon. That typically offsets most or all of a 2–3 BHK household’s consumption.
How long does installation take after I confirm?
Structural work and installation usually take 7–14 days for residential systems once material reaches your site. Net-metering approval and meter installation by MSEDCL typically add 3–6 weeks depending on the circle office workload.
Do you help with the PM Surya Ghar subsidy application?
Yes. We register your application on the national portal with your consumer number, follow up the feasibility approval with your DISCOM, submit the commissioning certificate and track the subsidy until it is credited to your bank account.
What is the difference between on-grid and hybrid solar?
An on-grid system exports surplus power and shuts down during a grid outage for safety. A hybrid system adds a battery bank so you keep running essential loads during outages while still enjoying net-metering credit for exported units.
Can I get a solar loan or EMI?
Yes. We prepare the project report and documentation for solar loans from SBI, Bank of Baroda, HDFC and NBFCs. A 3 kW system works out to roughly ₹2,450 per month over 60 months, which is usually less than the bill it replaces.
How much roof area is needed per kW?
Around 10 m² of shadow-free area per kW for standard modules, plus maintenance clearance. Elevated structures need slightly more spacing so module rows do not shade each other in December.
Do you service systems installed by other companies?
Yes. We audit the existing installation, list defects with photographs and quotes, then take over maintenance under an AMC or perform repairs such as inverter replacement, structure reinforcement or earthing rectification.

Visit or call our Nagpur team

Plot 22, IT Park Road, Gayatri Nagar, near Near Sadar, Nagpur, Maharashtra – 440015

9822012348   sales@ecoharbor.in

Talk to a solar engineer

Book your Nagpur site survey today

Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.

Call Now Free Site Survey