+91 98220 12345 sales@ecoharbor.in Mon – Sat, 9:30 AM – 7:00 PM
MNRE Channel Partner • MSEDCL Empanelled Serving all of Maharashtra

Elevated Galvanised Structure (per kW)

High-rise elevated structure for RCC terraces so panels do not shade each other and the roof stays usable underneath.

15 years corrosion warranty on galvanising
Elevated Galvanised Structure (per kW) supplied and installed by EcoHarbor Solar in Maharashtra

Elevated Galvanised Structure (per kW)

High-rise elevated structure for RCC terraces so panels do not shade each other and the roof stays usable underneath.

Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.

Why buyers choose this package

  • Complete bill of material shared before payment
  • Subsidy and net-metering handled end to end
  • Written generation estimate for your location
  • Five-year O&M included, AMC at ₹5,999/year after that

Package highlights

✔

Hot-dip galvanised or pre-galvanised MS sections

✔

3 ft to 8 ft elevation options

✔

Wind-rated for Maharashtra coastal and inland zones

✔

Module clamping rails with anti-theft fasteners

✔

Optional walkway and railing for maintenance

Technical specifications

MaterialHot-dip galvanised MS
Elevation3 ft / 5 ft / 8 ft
Wind ratingup to 150 km/h
Corrosion warranty15 years
Loaddistributed over existing beams
Warranty15 years corrosion warranty on galvanising

What the price includes

  • Structural design and drawings
  • Fabrication and galvanising
  • Site installation and anchoring
  • Paint touch-up and finishing

Subsidy & payment process

Apply on portal

We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.

Feasibility approval

MSEDCL approves the sanctioned capacity for your connection.

Install & net-meter

Installation, inspection and bidirectional meter commissioning.

Subsidy in bank

Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.

Elevated Galvanised Structure (per kW) FAQs

How much subsidy do I get on rooftop solar in Maharashtra?
Under PM Surya Ghar: Muft Bijli Yojana, residential consumers get ₹30,000 per kW up to 2 kW and ₹78,000 in total for 3 kW and above. The amount is credited directly to your bank account after installation and net-metering are completed.
How many units does a 3 kW solar system generate per month?
In Maharashtra a well-designed 3 kW rooftop system generates roughly 340–380 units per month across the year, higher in March–April and lower during the monsoon. That typically offsets most or all of a 2–3 BHK household’s consumption.
How long does installation take after I confirm?
Structural work and installation usually take 7–14 days for residential systems once material reaches your site. Net-metering approval and meter installation by MSEDCL typically add 3–6 weeks depending on the circle office workload.
Do you help with the PM Surya Ghar subsidy application?
Yes. We register your application on the national portal with your consumer number, follow up the feasibility approval with your DISCOM, submit the commissioning certificate and track the subsidy until it is credited to your bank account.
What is the difference between on-grid and hybrid solar?
An on-grid system exports surplus power and shuts down during a grid outage for safety. A hybrid system adds a battery bank so you keep running essential loads during outages while still enjoying net-metering credit for exported units.
Talk to a solar engineer

Ready for Elevated Galvanised Structure (per kW)?

Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.

Call Now Free Site Survey