Elevated Galvanised Structure (per kW)
High-rise elevated structure for RCC terraces so panels do not shade each other and the roof stays usable underneath.
Elevated Galvanised Structure (per kW)
High-rise elevated structure for RCC terraces so panels do not shade each other and the roof stays usable underneath.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
Hot-dip galvanised or pre-galvanised MS sections
3 ft to 8 ft elevation options
Wind-rated for Maharashtra coastal and inland zones
Module clamping rails with anti-theft fasteners
Optional walkway and railing for maintenance
Technical specifications
| Material | Hot-dip galvanised MS |
|---|---|
| Elevation | 3 ft / 5 ft / 8 ft |
| Wind rating | up to 150 km/h |
| Corrosion warranty | 15 years |
| Load | distributed over existing beams |
| Warranty | 15 years corrosion warranty on galvanising |
What the price includes
- Structural design and drawings
- Fabrication and galvanising
- Site installation and anchoring
- Paint touch-up and finishing
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
Elevated Galvanised Structure (per kW) FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for Elevated Galvanised Structure (per kW)?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.