20 kW Commercial Solar Plant
Fits housing societies, schools, clinics and small factories. Offsets common-area or process load at ₹9–₹11 per unit commercial tariff.
20 kW Commercial Solar Plant
Fits housing societies, schools, clinics and small factories. Offsets common-area or process load at ₹9–₹11 per unit commercial tariff.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
37 × 540 Wp modules
20 kW three-phase inverter with string monitoring
Structural design for RCC or metal shed
Remote monitoring with generation reports
Depreciation and financing documentation support
Technical specifications
| Modules | 37 × 540 Wp |
|---|---|
| Inverter | 20 kW three-phase |
| Generation | ~2,400 units per month |
| Roof area | ~200 m² |
| Payback | 4–5 years (commercial tariff) |
| Warranty | 25 years module performance, 5 years inverter, 5 years workmanship |
What the price includes
- Feasibility and design
- Complete EPC and commissioning
- DISCOM liaison
- 1 year comprehensive O&M (extendable)
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
20 kW Commercial Solar Plant FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 20 kW Commercial Solar Plant?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.